Facilities Director Joe McDonough met with Advisory on September 19th to brief them on the progress being made in the FMD since its start-up on July 1st. Please visit the following link to view a copy of the PowerPoint presentation: [Link] http://www.wellesleyma.gov/Pages/WellesleyMA_Facilities/advisorypresentation.pdf
Energy Savings at Town Hall
The Facilities Maintenance Department completed a major project to replace the chiller at Town Hall this summer. As part of the project, two circulation pumps were replaced with new variable frequency drive units, which will save the Town money by requiring substantially less energy. Please visit the following link for more information about this project: